Peak District Gravel Adventure

WHAT’S INCLUDED?

  • Point to point gravel riding adventure
  • 4 guided gravel rides with MIAS/BC qualified leader
  • 4 nights B&B accommodation
  • Luggage transfers
  • Support vehicle with drinks & snacks
  • Lunches
  • Mechanical support
  • Bike storage

WHAT’S NOT INCLUDED?

  • Evening meals
  • Personal sports travel & accident insurance covering off-road cycling

OPTIONAL EXTRAS

  • Gravel, MTB or E-Bike hire

Ride deep into the rugged landscapes of the Peak District, linking together remote bridleways, forest singletrack, ancient causeways and flowing cycle trails, with the occasional quiet lane connecting the best riding.

Expect loose gravel, technical sections and rewarding climbs, with huge views and a real sense of exploration throughout. This isn’t the smooth white-road gravel of Tuscany or the fast pistes around Girona. The Peaks are wilder, rougher, and all the more rewarding.
You should have good off-road bike handling skills and be comfortable on loose and technical terrain. Some sections may require short hike-a-bike and careful line choice. Come prepared to get stuck in and embrace the adventure.

This is proper British gravel.

Booking Request Form – Peak District Gravel Adventure

2026 Dates:

21st – 25th May 2026 – Spaces available

Can’t make this date? Get in touch for bespoke options

Pricing:

£825.00 per person

Sharing a twin or double room

Single occupancy supplement £200.00

Minimum 6 riders for this trip to be guaranteed

Requested Start Date:
Bikes Required:
012
Room Type:
Your Name:
Your Email:
Your Phone Number:

Extra Details:

Contact us now for more info

Pop us a few details and we’ll get in touch to discuss your future cycling holiday adventure.

Menu