
Morocco Gravel Adventure



- Point to point gravel riding adventure
- 6 guided gravel rides with MIAS qualified & local guide
- 7 nights accommodation in carefully selected Hotels/Riads
- Breakfast, lunch & evening meals
- Luggage transfers
- Support vehicle with drinks & snacks
- Mechanical support
- Ciclo Magic team and local Moroccan guide team
WHAT’S NOT INCLUDED?
- Flights
- Personal sports travel & accident insurance covering off-road cycling
- Any meals, drinks & snacks not included in the trip itinerary
- Personal trip spending funds
OPTIONAL EXTRAS
- Carbon gravel bike hire with GRX or equivalent – £295
A gravel bike adventure through Morocco’s rugged landscapes, where the Atlas Mountains reach the Sahara and an entwined culture awaits. Think epic gravel riding, wide vistas and rewarding days on the bike.
Riding country roads lined with olive groves, smooth hardpack gravel and loose sandy trails. Deeper within the mountains the route becomes more technical, where the gravel tracks can be rocky requiring a good level of off-road skill. Ascending sustained climbs with stunning views and thrilling descents, the days are jammed packed with adventure.
We pass through Berber villages, colourful lands of Saffron fields and historical landmarks including UNESCO World Heritage site, Ait Benhaddou Kasbah.
Reflect each evening with the group over Moroccan specialities including tagine, grilled meats, vegetables, cous cous and flatbreads.
Vehicle support will transport your luggage daily, provide emergency support, and ensure a smooth and safe tour.
Includes all accommodation, meals (including dinners in Marrakech on the 1st and last night), snacks (water, dried fruits, and fruits) and scheduled café stops.
For private group or bespoke trips please get in touch. We can tailor this trip for you.



Booking Request Form – Morocco Gravel Adventure
Dates:
10th – 17th October 2026
8th – 15th May 2027
Pricing:
£1,895.00 per person
Sharing a twin or double room
Single occupancy supplement – £295.00
Minimum 8 riders for this trip to be guaranteed
Contact us now for more info
Pop us a few details and we’ll get in touch to discuss your future cycling holiday adventure.
